RHT Dominator Pump Panel Startup Guide


Download PDF

This step-by-step guide covers mounting, piping, filling and purging, control setup, and startup checks for the RHT Dominator Pump Distribution Panel. Download the full PDF and refer back to the document during each phase of your radiant system installation.

Key Topics

  • Installing PEX Tubing
  • Manifold Mounting and Pressure Testing
  • Mouting the Dominator Pump Panel and Boiler
  • Mechanical Room Layout
  • Wiring Diagrams
  • Filling and Purging Your System