Free Shipping on orders over $300. Some exceptions apply 1-866-361-4782
Articles › RHT Column Startup Guide

RHT Column Startup Guide


Download PDF

This step-by-step guide covers mounting, piping, filling and purging, control setup, and startup checks for the RHT Column Pump Distribution Panel. Download the full PDF and refer back to the document during each phase of your radiant system installation.

Key Topics

  • Installing PEX Tubing
  • Manifold Mounting and Pressure Testing
  • Mouting the Column Pump Panel and Boiler
  • Wiring Diagrams
  • Filling and Purging Your System

Resources & Related Articles

Contact

Toll Free: (866) 361-4782

Fax: 206-274-1501

17420 Vashon Hwy SW
PO Box 2104
Vashon, WA 98070

Copyright © 2025 BlueRidgeCompany.com All rights reserved.